Termidor H-E High-Efficiency
DOT
WP/S&T
Applicators and other handlers must wear: Long-sleeved shirt and long pants Shoes plus socks Waterproof gloves, such as barrier laminate, butyl rubber ≥ 14 mils, nitrile rubber ≥ 14 mils, neoprene rubber ≥ 14 mils, natural rubber* ≥ 14 mils, polyethylene, polyvinyl chloride (PVC) ≥ 14 mils, or viton ≥ 14 mils * Includes natural rubber blends and laminates When working in a non-ventilated space, including but not limited to crawl spaces and basements, all pesticide handlers must wear: A dust/mist filtering respirator (MSHA/NIOSH approval number prefix TC-21C), or a NIOSH-approved respirator with any N, R, P or HE filter When working in a non-ventilated space, including but not limited to crawl spaces and basements or when applying termiticide by rodding or sub-slab injection, all pesticide handlers must wear: Protective eyewear (goggles, a faceshield, or safety glasses with front, brow, and temple protection)
Store unused product in original container only, out of reach of children and animals.
Sara Title III
Hazardous Ingredient | Cas # | Percent | EHS TPQ | TRQ of Ingredient |
---|---|---|---|---|
[Fipronil] | 120068-37-3 | 8.73 | NOL | |
Propylene glycol | 57-55-6 | 91.27 | NOL | STD |
[Fipronil] | |
Cas # | 120068-37-3 |
Percent | 8.73 |
EHS TPQ | NOL |
TRQ of Ingredient | |
Propylene glycol | |
Cas # | 57-55-6 |
Percent | 91.27 |
EHS TPQ | NOL |
TRQ of Ingredient | STD |
STATE RESTRICTIONS
State | Updated | Restriction Status |
---|---|---|
Alabama | 06/14/2019 | Not Restricted |
Arkansas | 06/14/2019 | Not Restricted |
Arizona | 06/14/2019 | Not Restricted |
California | 06/14/2019 | Not Restricted |
Colorado | 06/14/2019 | Not Restricted |
Connecticut | 06/14/2019 | Not Restricted |
Delaware | 06/14/2019 | Not Restricted |
Florida | 06/14/2019 | Not Restricted |
Georgia | 06/14/2019 | Not Restricted |
Hawaii | 06/14/2019 | Not Restricted |
Iowa | 06/14/2019 | Not Restricted |
Idaho | 06/14/2019 | Not Restricted |
Illinois | 06/14/2019 | Not Restricted |
Indiana | 06/14/2019 | Not Restricted |
Kansas | 06/14/2019 | Not Restricted |
Kentucky | 06/14/2019 | Not Restricted |
Louisiana | 06/14/2019 | Not Restricted |
Massachusetts | 06/14/2019 | Not Restricted |
Maryland | 06/14/2019 | Not Restricted |
Maine | 06/14/2019 | Not Restricted |
Michigan | 06/14/2019 | Not Restricted |
Minnesota | 06/14/2019 | Not Restricted |
Missouri | 06/14/2019 | Not Restricted |
Mississippi | 06/14/2019 | Not Restricted |
Montana | 06/14/2019 | Not Restricted |
North Carolina | 06/14/2019 | Not Restricted |
North Dakota | 06/14/2019 | Not Restricted |
Nebraska | 06/14/2019 | Not Restricted |
New Hampshire | 06/14/2019 | Not Restricted |
New Jersey | 06/14/2019 | Not Restricted |
New Mexico | 06/14/2019 | Not Restricted |
Nevada | 06/14/2019 | Not Restricted |
Ohio | 06/14/2019 | Not Restricted |
Oklahoma | 06/14/2019 | Not Restricted |
Oregon | 06/14/2019 | Not Restricted |
Pennsylvania | 06/14/2019 | Not Restricted |
Rhode Island | 06/14/2019 | Not Restricted |
South Carolina | 06/14/2019 | Not Restricted |
South Dakota | 06/14/2019 | Not Restricted |
Tennessee | 06/14/2019 | Not Restricted |
Texas | 06/14/2019 | Not Restricted |
Utah | 06/14/2019 | Not Restricted |
Virginia | 06/14/2019 | Not Restricted |
Vermont | 06/14/2019 | Not Restricted |
Washington | 06/14/2019 | Not Restricted |
Wisconsin | 06/14/2019 | Not Restricted |
West Virginia | 06/14/2019 | Not Restricted |
Wyoming | 06/14/2019 | Not Restricted |
Alaska | 06/14/2019 | Restricted |
New York | 06/14/2019 | Restricted |
PRODUCT APPLICATION
CONCRETE SLAB ON GROUND IN BASEMENTS (INCLUDING MONOLITHIC/FLOATING/SUPPORTED CONCRETE SLABS)
-
Horizontal Treated Zones
- 1.0 - 1.5 Gal Finished Dilution / 10 Sq_Ft
- 0.06 % Solution
- 0.125 % Solution
-
Vertical Treated Zones
- 1 Gal Finished Dilution / Sq_Ft
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Crawl Spaces
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Horizontal Treated Zones
- 0.06 - 0.125 % Solution
- 1.0 - 1.5 Gal / Sq_Ft
-
Vertical Treated Zones
- 1 Gal / Sq_Ft
- 0.125 % Solution
-
Crawl Spaces
- 0.125 % Solution
HOLLOW BLOCK FOUNDATIONS/VOIDS
-
Hollow Block Foundations/voids
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Hollow Block Foundations/voids
- 2 Gal / Ft
- 0.125 % Solution
-
Hollow Block Foundations/voids
- 0.125 % Solution
POST-CONSTRUCTION CONVENTIONAL STRUCTURAL TREATMENTS
-
Post-Construction Conventional Structural Treatments
- 0.125 % Finished Dilution
-
Hollow Block Foundations/voids
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft
- 0.125 % Solution
CONCRETE SLAB OVER SOIL (INCLUDING MONOLITHIC/FLOATING/SUPPORTED CONCRETE SLABS)
-
Exterior Perimeter
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Sub-Slab Injection (Vertical Drilling/injection)
- 2 Gal / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Sub-Slab Injection (Horizontal Drilling/rodding/sub-Slab Injection)
- 2 Gal / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Sub-Slab Injection (Shower Pan Drains)
- 1 - 4 Gal / 10 Shower Pan Drain
-
Sub-Slab Injection (Bath Traps)
- 1 - 4 Gal / Sq_Ft
-
Exterior Perimeter
- 0.125 % Solution
-
Sub-Slab Injection (Shower Pan Drains)
- 1 - 4 Gal
-
Sub-Slab Injection (Vertical Drilling/injection)
- 2 Gal / Ft
-
Sub-Slab Injection (Horizontal Drilling/rodding/sub-Slab Injection)
- 0.125 % Solution
- 2 Gal / Ft
-
Sub-Slab Injection (Bath Traps)
- 1 - 2 Gal / Sq_Ft
STRUCTURES WITH FRENCH DRAINS AND SUMP PUMPS
-
Structures With French Drains And Sump Pumps
- 0.125 % Finished Dilution
-
Structures With French Drains And Sump Pumps
- 0.125 % Solution
BASEMENT STRUCTURES
-
Exterior Perimeter
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Interior Perimeter
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Interior Perimeter
- 0.125 % Solution
-
Exterior Perimeter
- 0.125 % Solution
CRAWL SPACES
-
Accessible Crawl Space Construction
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Inaccessible Crawl Space Construction
- 1 - 1.5 Gal Finished Dilution / 10 Sq_Ft
- 0.06 % Solution
- 0.125 % Solution
-
Inaccessible Crawl Space Construction
- 1 - 1.5 Gal / Sq_Ft
- 0.06 % Solution
- 0.125 % Solution
-
Accessible Crawl Space Construction
- 0.125 % Solution
- 2 Gal / Ft
TREATMENT OF STRUCTURES WITH WELLS OR CISTERNS
-
Treatment Of Structures With Wells Or Cisterns
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Treatment Of Structures With Wells Or Cisterns
- 2 Gal / Ft
- 0.125 % Solution
STRUCTURES WITH ADJACENT WELLS OR CISTERNS AND/OR OTHER WATER BODIES
-
Structures With Adjacent Wells Or Cisterns And/or Other Water Bodies
- 0.125 % Finished Dilution
PLENUM CONSTRUCTION
-
Plenum Construction
- 0.125 % Finished Dilution
-
Plenum Construction
- 0.125 % Solution
POST-CONSTRUCTION EXTERIOR PERIMETER/LOCALIZED INTERIOR (EP/LI) STRUCTURAL TREATMENTS
-
Exterior Perimeter Treatment
- 0.125 % Finished Dilution
-
Concrete Slab On Ground (Including Monolithic/floating/supported Concrete Slabs)
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Basement And Inaccessible Crawl Space Construction
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Accessible Crawl Spaces
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Sub-Slab Injection (Vertical Drilling/injection)
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Sub-Slab Injection (Horizontal Drilling/rodding/sub-Slab Injection)
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Hollow Block Foundations
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Shower Pan Drains
- 1 - 4 Gal 0.125 % Finished Dilution / Shower Pan Drain
- 0.125 % Solution
-
Bath Traps
- 1 - 2 Gal / Sq_Ft
-
Bath Traps
- 0.125 % Solution
- 1 - 2 Gal / Sq_Ft
-
Sub-Slab Injection (Vertical Drilling/injection)
- 0.125 % Solution
- 2 Gal / Ft
-
Hollow Block Foundations
- 0.125 % Solution
- 2 Gal / Ft
-
Shower Pan Drains
- 1 - 4 Gal
- 0.125 % Solution
-
Basement And Inaccessible Crawl Space Construction
- 0.125 % Solution
- 2 Gal / Ft
-
Exterior Perimeter Treatment
- 0.125 % Solution
-
Accessible Crawl Spaces
- 0.125 % Solution
- 2 Gal / Ft
-
Concrete Slab On Ground (Including Monolithic/floating/supported Concrete Slabs)
- 2 Gal / Ft
- 0.125 % Solution
-
Sub-Slab Injection (Horizontal Drilling/rodding/sub-Slab Injection)
- 0.125 % Solution
- 2 Gal / Ft
LOCALIZED INTERIOR TREATMENT
-
Localized Interior Treatment
-
Localized Interior Treatment
INTERIOR CONCRETE FLOOR
-
Interior Concrete Floor
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft
- 0.125 % Solution
-
Interior Concrete Floor
- 0.125 % Solution
- 2 Gal / Ft
FOAM APPLICATIONS
-
Foam Applications
- 0.125 % Finished Dilution
-
Foam Applications
- 0.125 % Solution
USE WITH OTHER TERMITICIDE PRODUCTS
-
Use With Other Termiticide Products
- 0.125 % Finished Dilution
-
Use With Other Termiticide Products
- 0.125 % Solution
POSTS, POLES, WOOD LANDSCAPE ORNAMENTATION
-
Posts, Poles, Wood Landscape Ornamentation
- 2 Gal 0.125 % Finished Dilution / 10 Linear_Ft / Ft_Of_Depth
- 0.125 % Solution
-
Posts, Poles, Wood Landscape Ornamentation
- 0.125 % Solution
- 2 Gal / Ft
TERMITES ABOVE GROUND
-
Termites Above Ground
- 0.125 % Finished Solution
-
Termites Above Ground
- 0.125 % Solution
POST-CONSTRUCTION CONVENTIONAL STRUCTURAL TERMITE TREATMENTS
-
Post-Construction Conventional Structural Termite Treatments
- 0.125 % Solution
STRUCTURES WITH ADJACENT WELLS/CISTERNS AND/OR OTHER WATER BODIES
-
Structures With Adjacent Wells/cisterns And/or Other Water Bodies
- 0.125 % Solution